Traffic Will Flow Smoother at 59 and Brentwood - KTRE.com | Lufkin and Nacogdoches, Texas

12/20/05 - Lufkin

Traffic Will Flow Smoother at 59 and Brentwood

by Ramonica R. Jones

Navigating through traffic will be a little smoother for folks in Lufkin. TxDot has installed new traffic signals at Highway 59 and the Daniel McCall/Brentwood Drive overpass.

The lights will start working Wednesday afternoon. Drivers should approach that intersection with caution while the public gets used to the new signals.

The lights are only temporary and are equipped with video detection. The permanent signals are included in a highway project and are in the final design states.

Powered by Frankly